Click on an image to display a larger view.
 |
 |
| Work Session C group photo. |
|
 |
 |
 |
| Susan Krech (foreground) digs out weeds while Alta Berkstresser (team leader) and Joan Krech work out landscaping plans for the south side of the Chama restroom building. |
|
 |
 |
 |
 |
| Dick Caldwell (team leader) sorts through stencils while the rest of the team--(l to r) Craig Story, Anne Woolsey, Robin Kumler, Craig Kumler and Beau Story--gather additional materials. |
|
 |
 |
 |
| Carl Tebbens and Frank Smucker (team leader) watch as Tina Tebbens raises a railroad tie near the Chama track scale in order to put more ballast underneath. |
|
 |
 |
 |
 |
| Mike McGinley (left) and Don Storm at work on RPO X54. |
|
 |
 |
 |
| Robert Thomas and Herb Knoesel watch as Bob Thomas climbs down the scaffolding after removing roof shingles from the Chama log bunkhouse. |
|
 |
 |
 |
 |
| Anne Woolsey stencils refrigerator car 169. |
|
 |
 |
 |
| John Mitchell, Jim Gross (team leader), Bob Ross, and Walt Duncan (front to back) prepare to reset milepost 344 in its historical location. |
|
 |
 |
 |
 |
| Wayne Huddleston (team leader), in the basket of the hydraulic lift, prepares to remove the "bird house" in order to reposition the cross arm on the correct side of the pole. Bob Hawkins, Mike Welch, and Erik Welch spot from north end of the depot. |
|
 |
 |
 |
| Craig Kumler touches up the stenciling on refrigerator car 169. |
|
 |
 |
 |
 |
| Marshall Smith, Jill Barbour, John Engs, Jim O'Keefe and Bob McCain
move the band saw onto dolly to clear room for electrical work. |
|
 |
 |
 |
| Doug Pope and George Berkstresser (team leader) begin securing new planks to the Chama stockyard walkway. |
|
 |
 |
 |
 |
| Warren Ringer threads the end of 5/8-inch body rod. |
|
 |
 |
 |
| Bill Barbour and Warren Ringer, with Jim Florey above, install a vertical body wood truss. |
|
 |
 |
 |
 |
| Volunteers work on the Chama depot roof. |
|
 |
 |
 |
| Beau Story, Craig Story and Dick Caldwell stencil the side of the museum car 3533. |
|
 |
 |
 |
 |
| Ron Horejsi, Mike Wissler and Scott Hardy (team leader) work on the Chama bunkhouse roof while Bob Thomas works from the scaffolding and Todd Frazier and Herb Knoesel assist from the ground. |
|
 |
 |
 |
| Unloading the 12-inch table saw (l to r): Don Storm, Russ Hanscom, Ed Lowrance, Bob Reib, Richard Edwards and Craig McMullen (team leader). |
|
 |
 |
 |
 |
| Tim Bristow, Dave Traudt and Bob Keene work on the Chama depot roof. |
|
 |
 |
 |
| Scott Hardy (team leader), Todd Frazier, Ron Horejsi, Herb Knoesel, Bob Thomas and Mike Wissler take time from roofing the Chama bunkhouse to wave at the departing passenger train. |
|
 |
 |
 |
 |
| Museum Car 3533 after lettering of the B end was completed. A different era is depicted on the A end and opposite side. |
|
 |
 |
 |
| Mike Welch, Bob Hawkins and Wayne Huddleston (team leader) bundle telegraph wire as they remove it from the spool. |
|
 |
 |
 |
 |
| Phil Barney installs the roof on the cupola of caboose 0503. |
|
 |
 |
 |
| Jerry Hawkins paints a restored baggage cart. |
|
 |
 |
 |
 |
| Anne Woolsey and Robin Kumler letter boxcar 3605 as Craig Kumler holds the ladder. |
|
 |
 |
 |
| (l to r) Don Bayer (team leader), George Bryson and Bill Lock drill holes in right side sill of RPO X54. |
|
 |
 |
 |
 |
| (l to r) Phil Barney and David Priddle install the roof on the cupola of caboose 0503. |
|
 |
 |
 |
| Bob Hawkins performs the final tie-off on the two-arm telegraph pole south of the carpenter shop. |
|
 |
 |
 |
 |
| Mike Thode (team leader) assembles one of the trucks for caboose 0503. |
|
 |
 |
 |
| Gabrielle Holodnak paints the undercarriage of a restored baggage cart. |
|
 |
 |
 |
 |
| Jim Florey drills pilot holes for screws to transverse the nailing strip. |
|
 |
 |
 |
| Todd Frazier hands Scott Hardy (team leader) another shingle for the new Chama log bunkhouse roof while Mike Wissler and Bob Thomas look on. In the background Ron Horejsi climbs up the scaffold. |
|
 |
 |
 |
 |
| Norval Alliston and Adolph Weigant install the fourth panel of the Cumbres information kiosk. |
|
 |
 |
 |
| The Landscape team puts the finishing touch on the Iris garden. Left to right:Ê Susan Krech, Alta Berkstresser (team leader), Joan Krech, Gabrielle Holodnak (on top of rock) and Laurel Lyon. |
|
 |
 |
 |
 |
| David Webster puts some finishing touches on the Jordan spreader. |
|
 |
 |
 |
| Erik Welch and Michael Welch pull the rope that is bringing the wire over to the telegraph pole south of the Chama restrooms. |
|
 |
 |
 |
 |
| David Priddle attaches fascia board on caboose 0503. |
|
 |
 |
 |
| Thom Hindman bolts in place the outer right side sill on the A end of X54. |
|
 |
 |
 |
 |
| Pulling pile driver OB out of the Antonito CRF. |
|
 |
 |
 |
| Pile driver OB in place for demonstration. |
|
 |
 |
 |
 |
| Jim Florey with RPO X54 in the Antonito CRF. |
|
 |
 |